PE Water Supply Pipe Sticking Process

Oct 27, 2022

Leave a message


PE water supply pipe sticking process: PE water supply pipe bonding joints shall not be constructed in rain or water, and shall not be operated below 5 °C; PE water supply pipe connection procedure: preparation → cleaning work surface → test insertion → brushing adhesive → bonding → conservation. PE pipe is a non-polar material, insoluble in other organic and inorganic solvents. It is not recommended to stick with glue unless it is a special case. It can be welded by hot melting or electrofusion, or flanged flanges can be used for mechanical connection.



pe pipe

Send Inquiry