After the radiator is installed, it must be tested and accepted. Usually during the replacement construction, the workers will reserve the valve on the pipeline, and the stamping test should be carried out after the installation. Make sure that there are no leaks, drips, leaks, or running water, and there is no problem with the installation of the radiator. This completes the test and acceptance of the radiator.