PEX pipe system, cold and hot water supply, PEX tee fitting, thread connection, 16-32mm, brass double color, brass compression fitting
Feature
| Products Name | PEX Tee Fitting | Material | 58-3 brass |
Pressure | PN25 | Temperature | MAX 95℃ |
Warranty | long-term durability according to standards | Packing | separate opp bag |
Application | water supply | Connection Thread | press and thread |
Advantage
1. The brass connector is easy to connect, will not rust, and is easy to repair. Has good corrosion resistance
2. Due to the variety of colors of brass joints, it has many advantages such as beautiful and durable, easy to install, safe and fireproof, and health care.
3. brass ions have a strong disinfection and sterilization effect, which can prevent some common livestock diseases. brass is an indispensable micro-nutrient for human health, for the blood, central nervous system and immune system, hair, skin and bone tissues, brain, liver, heart, etc. The development and function of internal organs have an important influence
Clean oxidized brass products
1. Vinegar soaking method: Wash the oxidized copper, put it in a container, and pour a little vinegar until it is submerged. After 24 hours, take it out, use a small brush to remove the residual rust, then wash it with water, and dry it in the shade.
2. Boiling water soaking method: Put the rusty and oxidized copper into a bowl, and pour boiling water at a temperature of 80°C to 90°C until it is immersed. Take it out after 5 minutes, clean it with a small brush, and dry it in the shade.
3. Cleaning agent method: Use special bright cleaning agent for brass materials to clean, then rinse with water and dry in the shade to quickly restore the original gloss of the copper parts and make them as bright as new.
Other products 
FAQ
1. Is sample available before normal order?
Yes! But customer need to bear express cost. Samples are free.
2. What is your MOQ?
Usually our MOQ is 200-360pcs for small size. For big size (1 1/4-2"), it is 100pcs. But, it is based on products value.
3.How long is the production lead time?
Commonly, it takes 20-25 days. It is depend on material requirement. If it is special material, delivery term will long.