Bathroom water pipe installation strategy

Sep 28, 2022

Leave a message


Bathroom water pipe installation strategy: The first point: the reasonable layout of the bathroom water pipe. The water pipes are generally horizontal and vertical, and special corner pipes will be used for joints where the joints need corners. It is forbidden to cross the water pipes. If it is a last resort, a reasonable layout design in terms of distance is required. In the middle of the bathroom, there are no strict requirements for this height. According to your own preferences, choose the most comfortable one. The installation of the water heater and the water inlet of the washing machine must be arranged in the most reasonable way. The second point: the toilet water pipe needs to be pressure tested. After all the water pipes are installed, the pressure measurement process is to check whether the installation is reasonable. Before the pressure measurement, the back valve of the water meter should be closed, and the end of the pressure test pipe should be blocked and slowly injected with water. , After the pressure is stabilized, the pressure drop within half an hour does not exceed 0.05Mpa to be qualified. The third point: the correct order of toilet plumbing installation. First of all, we need to discuss the specific direction of the waterway with the installer in detail, fix the clip to the wall with an electric hammer, start to use a professional hot melt machine to hot-melt the pipe, use a pressure test pump to test the entire pipeline, and finally Clean up the site.



ppr pipe

Send Inquiry