In the acid-alkali wastewater treatment system, the installation and maintenance of PPH pipes need to pay attention to the following issues:

5903818

 

Inspection before installation: Check the appearance of the pipe to ensure there are no damages, cracks, and other defects.

Clean the pipeline: Thoroughly clean the inside of the pipeline before installation to avoid the impact of impurities.

Strictly install according to the specifications: Including the connection method of the pipeline and the tightening force, etc.

Pay attention to the slope of the pipeline: Ensure that the wastewater can flow smoothly and avoid water accumulation.

Corrosion prevention treatment: Carry out anti-corrosion treatment on easily corroded parts such as the connection of the pipeline.

Regular inspections: Including checking whether there is any leakage or deformation of the pipeline.

Clean and maintain: Regularly clean the pipeline to prevent the accumulation of dirt.

Avoid external force impact: Prevent the pipeline from being accidentally hit or squeezed.

Pay attention to temperature changes: Avoid the impact of too high or too low temperatures on the pipeline.

Timely repair: Discover problems and carry out maintenance or replacement of components in a timely manner.

Record maintenance situation: Convenient for tracing and analyzing problems.

Train operating personnel: Ensure that the operating personnel understand the characteristics and maintenance requirements of the pipeline.