The installation process of the ferrule joint

Jan 21, 2022

Leave a message


During handling and storage, the ferrule joint should avoid impact and falling, so as not to damage the interface and internal parts; install the machine concentrically as much as possible to ensure the good operation of the rotary joint; when installing the threaded ferrule joint, pay attention to the internal . Whether the thread direction of the outer pipe corresponds to the rotation direction of the drum, the thread rotation direction should be consistent; the connection between the ferrule joint and the pipe must be connected by a hose, and rigid connection is absolutely prohibited; the inlet and outlet of the ferrule joint should be directly connected to the pipe. Hose is connected. In order to reduce the auxiliary weight of the ferrule joint and prolong the service life; the support and anti-rotation of the ferrule joint should be appropriate. Generally, the diameter of the rod should be 2mm smaller than the anti-rotation hole, so as not to affect the free adjustment and compensation of the rotary joint; Assembly, pay attention to the matching of size and the auxiliary support of weight.



Brass Male Union Socket

Send Inquiry