PE water supply pipe hot-melt connection method: At present, because most PE pipes are large-diameter main pipes, hot-melt connections are often used. The principle of hot-melt connection is to clamp the two fusion interfaces of PE pipe and PE water supply pipe with a heating plate, heat up to melt, and remove the heating tool after reaching the hot-melt index, and make the two ends of the PE water supply pipe under the action of a certain pressure. Join together and hold until the joint cools for hot melt purposes.
