Construction preparation of PEX pipeline: material quality control needs to check the product warranty; check the appearance of the product for bubbles and cracks; check the size deviation and wall thickness. Brass clamp connection: The clamp ring port is required to be 2.5mm~3mm away from the root of the pipe socket, and the joint is required to be firm and not fall off and leak.
